Though not computer savy,,
I think tributary area has to be taken
Say if pile is of D m dia
The peripheral length = pi*D
If you are putting N springs along circum ference
And spaci ... |
Topic: Longitudinal forces in bearing level |
vikram.jeet
Replies: 1
Views: 539
|
Forum: Dams and Bridges Posted: Wed Nov 27, 2024 4:11 pm Subject: Longitudinal forces in bearing level |
First of all let us think of one span
S S span
Deck Expanding -
Traffic moving from fixed to free bearing ,, Deck expanding
Fixed bearing force = B - T
Free Bearing Force = T
Deck Contrac ... |
Topic: One Way Shear critical section overlap in Footings with closely spaced Columns |
vikram.jeet
Replies: 8
Views: 2081
|
Forum: SEFI General Discussion Posted: Wed Nov 20, 2024 1:56 pm Subject: One Way Shear critical section overlap in Footings with closely spaced Columns |
Enhanced shear capacity can be taken in above case as per IS 456 as enlightened by Er Rahul saheb. |
Topic: Steel Column Design over RCC Frame |
vikram.jeet
Replies: 2
Views: 1357
|
Forum: SEFI General Discussion Posted: Fri Nov 15, 2024 11:07 pm Subject: Steel Column Design over RCC Frame |
Steel column s shed over Rcc column structure
I think it is better to go for pipe columns ( round/ square) having L/R same in two directions.
May be I section failing due to L/R in Lz dir.
... |
Topic: One Way Shear critical section overlap in Footings with closely spaced Columns |
vikram.jeet
Replies: 8
Views: 2081
|
Forum: SEFI General Discussion Posted: Fri Nov 15, 2024 2:55 am Subject: One Way Shear critical section overlap in Footings with closely spaced Columns |
Shear check - is a must
One way shear needs to be checked at mid section of two columns spacing distance,, in situation under discussion
To just summarize : (Statement already given in my pre ... |
Topic: Design of slab on grade connected to plinth beam |
vikram.jeet
Replies: 3
Views: 1245
|
Forum: SEFI General Discussion Posted: Thu Nov 14, 2024 3:52 am Subject: Design of slab on grade connected to plinth beam |
The soil under grade slab level is generally filled up, though little compacted, but has low bearing capacity compared to strata at foundation level.
Not a practice to take advantage of this in desi ... |
Topic: One Way Shear critical section overlap in Footings with closely spaced Columns |
vikram.jeet
Replies: 8
Views: 2081
|
Forum: SEFI General Discussion Posted: Tue Nov 12, 2024 2:53 am Subject: One Way Shear critical section overlap in Footings with closely spaced Columns |
By thinking logically :-
For Two way Shear to be checked at d/2 - if Columns are closer than d, then two way shear will overlap on this direction,, and There is need to check assuming Two columns ... |
Topic: ASCE's Edmund Friedman Professional Recognition Award |
vikram.jeet
Replies: 37
Views: 7631
|
Forum: SEFI General Discussion Posted: Fri Nov 01, 2024 8:32 am Subject: ASCE's Edmund Friedman Professional Recognition Award |
Respected N S Sir 's award and recognition in International Arenas is great ,,not only for himself, but for all Indians . His contributions to the field of Structural / Civil Engineering are beyond d ... |
Topic: STIRRUP FAILURE |
vikram.jeet
Replies: 3
Views: 6413
|
Forum: Speak Out Box Posted: Mon Oct 28, 2024 1:52 pm Subject: STIRRUP FAILURE |
In this case :-
Please visit prime designer of Structure and share the actually provided at site.
He will suggest how much extra / Additional reinf in form of long bars as also insertion of rings ... |
Topic: STIRRUP FAILURE |
vikram.jeet
Replies: 3
Views: 6413
|
Forum: Speak Out Box Posted: Mon Oct 28, 2024 9:06 am Subject: STIRRUP FAILURE |
BUT IF SAID BEAM IS TRANSFER BEAM CARRYING ANY COLUMN LOAD OR MAIN BEAM CARRYING HEAVY POINT LOAD,, SUCH SUGGESTIONS SHALL NOT WORK . |
|