nagaraju_pogula SEFI Member
Joined: 26 Jan 2003 Posts: 9
|
Posted: Thu Apr 03, 2003 9:39 am Post subject: reinf. detailing |
|
|
Dear friends,
I am relatively new to field of structural engg. I have a few queries and request help from my learned colleagues of this field:
1) I have a situation where I have to substitute the existing longitudinal bars of columns of dia 28 tor which are not available in the market with bars of some other dia. like 32,25,20 etc. Now splicing is to be done in the ground floor (plinth beams were cast). The 28 tor bars are provided upto-splicing zone of the ground floor columns. (16 no-28 Tor). Can I substitute 16no.-28 Tor with 8no-32 tor plus 8no-25 tor which gives little more area than required. If this arrangement is permitted, what splice length I have to provide for 28/32 lapping? Should it be as required for 28 dia or for 32 dia.
2) We are planning a riser-less staircase with a central stringer beam. Consequently only a tread slab (step) with over-hang on both sides of stringer beam is required to be provided .The reinforcement detailing of the junction of stringer beam and tread slab is given in sp-34 (pg. 145). In the sloping stretch of the stringer beam not more than one tensile bar of the tread slab can be tied to the beam top bars and the remaining tensile bars of tread slab will be little elevated corresponding to the beam top bars at any given junction. Kindly suggest what arrangement is to be done at the interface of this stringer beam – tread slab junction.
Regards
P.nagaraju
---------------------------------
Posted via Email |
|
Back to top |
|
|
mc.upadhyay1 ...
Joined: 26 Jan 2003 Posts: 134
|
Posted: Fri Apr 04, 2003 6:53 am Post subject: reinf. detailing |
|
|
Hello I think you should provide lap length (=development length) according to the big dia. bar because the total new area ( which is now a combination of different dia. bars) will also be fully stressed as the old one will be; for a load combination for which it was originally designed. i.e. for combination of 28 & 32 it will be for 32 & for combination of 28 & 25 it will be for 28.
Regards M. C. Upadhyay
nagaraju_pogula@ yahoo.com To: mc.upadhyay@jil.co.in cc: 04/03/03 03:12 Subject: reinf. detailing PM Please respond to general
Dear friends,
I am relatively new to field of structural engg. I have a few queries and request help from my learned colleagues of this field:
1) I have a situation where I have to substitute the existing longitudinal bars of columns of dia 28 tor which are not available in the market with bars of some other dia. like 32,25,20 etc. Now splicing is to be done in the ground floor (plinth beams were cast). The 28 tor bars are provided upto-splicing zone of the ground floor columns. (16 no-28 Tor). Can I substitute 16no.-28 Tor with 8no-32 tor plus 8no-25 tor which gives little more area than required. If this arrangement is permitted, what splice length I have to provide for 28/32 lapping? Should it be as required for 28 dia or for 32 dia.
2) We are planning a riser-less staircase with a central stringer beam. Consequently only a tread slab (step) with over-hang on both sides of stringer beam is required to be provided .The reinforcement detailing of the junction of stringer beam and tread slab is given in sp-34 (pg. 145). In the sloping stretch of the stringer beam not more than one tensile bar of the tread slab can be tied to the beam top bars and the remaining tensile bars of tread slab will be little elevated corresponding to the beam top bars at any given junction. Kindly suggest what arrangement is to be done at the interface of this stringer beam – tread slab junction.
Regards
P.nagaraju
(http://www.reach1to1.com )======
--------------------------------- Yahoo! Mail - For a better Internet experience
(http://www.reach1to1.com )======
_________________________________________________________ Jaiprakash Industries Limited.
DISCLAIMER: Information contained and transmitted by this E-MAIL is proprietary to Jaiprakash Industries Limited and is intended for use only by the individual or entity to which it is addressed, and may contain information that is priviledged, confidential or exempt from disclosure under applicable law. If this is a forwarded message, the content of this E-MAIL may not have been sent with the authority of the Company. If you are not the intended recipient, and agent of the intended recipient or the person responsible for delivering the information to the named recipient, you are notified that any use, distribution, transmission, printing, copying or dissemination of this information in any way or in any manner is strictly prohibited. If you have recieved this communication in error, please delete/discard this mail & notify us immediately at webmaster@jil.co.in. _________________________________________________________ This mail has been checked and cleaned for viruses using Symantec AV.