View previous topic :: View next topic |
Author |
Message |
abhy_vivek Silver Sponsor
Joined: 26 Jan 2003 Posts: 690
|
Posted: Thu Mar 13, 2014 11:27 am Post subject: Continuous - Segmental Box Girder |
|
|
Dear All,
Has anyone experienced a design and constructed of Continuous-Segmental Box Girder Superstructure ?
I am doing one project, in India and have some specific questions related to design and execution of the same.
Regards
Vivek Abhyankar
Mumbai |
|
Back to top |
|
|
abhy_vivek Silver Sponsor
Joined: 26 Jan 2003 Posts: 690
|
Posted: Fri Mar 14, 2014 10:58 am Post subject: Re: Continuous - Segmental Box Girder |
|
|
As insisted by a few colleagues and friends, I am elaborating the questions as below :-
Q.1. Has anyone done continuous segmental bridges without a 'Wet-Joint' ?
Q.2. If yes then how the segment movements (elastic shortening / shrinkage / creep etc.) were addressed at design and execution stage? How the segment casting done ?
Q.3. Were the couplers used ? If so then in inclination position or the cables were flat ?
Q.4. What was the provision made in the bearings and the pedestals to allow for the tolerance (errors) in casting and the moments during placement of superstructure ?
Q.5. How the synchronisation was done / achieved between the segments cast in yard vs. the piers cast at site ?
Q.6. How the provision was made for curvature and longitudinal-gradient and super elevation?
Regards
Vivek Abhyankar
abhy_vivek wrote: | Dear All,
Has anyone experienced a design and constructed of Continuous-Segmental Box Girder Superstructure ?
I am doing one project, in India and have some specific questions related to design and execution of the same.
Regards
Vivek Abhyankar
Mumbai |
|
|
Back to top |
|
|
|
|
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot edit your posts in this forum You cannot delete your posts in this forum You cannot vote in polls in this forum You cannot attach files in this forum You can download files in this forum
|
|
|
|