www.sefindia.org

STRUCTURAL ENGINEERING FORUM OF INDIA [SEFI]

 Forum SubscriptionsSubscriptions DigestDigest Preferences   FAQFAQ   SearchSearch   MemberlistMemberlist   UsergroupsUsergroups  RegisterRegister FAQSecurity Tips FAQDonate
 ProfileProfile   Log in to check your private messagesLog in to check your private messages   Log in to websiteLog in to websiteLog in to websiteLog in to forum 
Warning: Make sure you scan the downloaded attachment with updated antivirus tools  before opening them. They may contain viruses.
Use online scanners
here and here to upload downloaded attachment to check for safety.

How a design for the Bay bridge, chosen for Aesthetics alone resulted in Problems

 
Post new topicReply to topic Thank Post    www.sefindia.org Forum Index -> Engineering Marvels
View previous topic :: View next topic  
Author Message
Dr. N. Subramanian
General Sponsor
General Sponsor


Joined: 21 Feb 2008
Posts: 5552
Location: Gaithersburg, MD, U.S.A.

PostPosted: Mon Nov 28, 2022 6:44 pm    Post subject: How a design for the Bay bridge, chosen for Aesthetics alone resulted in Problems Reply with quote

Read how a team of architects and engineers debated on what structure they should choose for the Bay Bridge in California: the more conventional span called a cable-stayed bridge or the novel, self-anchored suspension design. They decided on the  self-anchored suspension design against the wishes of most the influential and visionary structural engineers of the 20th century, Tung-Yen (T.Y.) Lin. The design “was chosen on the basis of aesthetics and broader community input without a full appreciation of the complexity of the undertaking and the potential for problems and cost overruns”.

The result is over the years, as challenges mounted and costs soared.
A batch of galvanized rods needed for extra seismic strength on the unusual bridge cracked, adding more than $45 million in costs. A Chinese crane maker won the money-saving contract to make pieces of the bridge, but turned out shoddy welds and produced ill-fitting road decks at risk of premature cracking.


Connecting the self-anchored suspension span to the skyway portion of the bridge turned out to be “the fabrication challenge of a lifetime,” and slowed down the project by a year and added $145 million to the bill.
More at:
https://www.sfgate.com/bayarea/article/Bay-Bridge-s-troubles-How-a-landmark-became-a-6021955.php
Back to top
View user's profile Send private message
Display posts from previous:   
Post new topicReply to topic Thank Post    www.sefindia.org Forum Index -> Engineering Marvels All times are GMT
Page 1 of 1

 

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum
You cannot attach files in this forum
You can download files in this forum


© 2003, 2008 SEFINDIA, Indian Domain Registration
Publishing or acceptance of an advertisement is neither a guarantee nor endorsement of the advertiser's product or service. advertisement policy